By: Gil Castonquay
In this segment we'll focus on the "Rilem Tube" test method. If this were a full length article, we certainly would get into a more detailed background as to how the test came to be, such as how RILEM originated in France and is actually an acronym for Réunion Internationale des Laboratoires et Experts des Matériaux, and is conducted per the RILEM Commission 25, PEM, Test Method 1154, but, for the purpose of this blog, for brevity sake, we'll just cover some of the high points to provide a brief overview as to how and why this test method, this tool, should be a part of your diagnostic approach tool bag when evaluating building enclosure performance.
Friday, March 8, 2013
AAMA 501.2 Testing as an Instrument of Effective New Construction Quality Control Programs
By:
Craig Andrade
AAMA
501.2 Testing, sometimes referred to as “Monarch Testing” or “Hose Testing”, is
a practical and cost efficient method of assuring the watertight installation
of fenestration and cladding systems, for new construction as a quality control
measure and for existing construction as a diagnostic tool. For brevity
sake, this blog pertains to the benefits that can be employed during a new
construction project.
Calculating Composite Production Values for Multi-Item Assemblies
By: Charles B. Antone
In the following brief, I will
show the underlining governing equation for calculating composite production
values for multi-item assemblies. A
multi-item assembly can be represented in a multitude of forms, but in this
discussion I will focus primarily on calculating production based construction
cost estimates. Once understood, the composite production value underlining
equation can be used forensically, as well as as a means to track the real-time
labor usage on an active construction site.
Friday, March 1, 2013
Water By-Passing Window Perimeter Joints
By: Dominic L. Pusateri
Perimeter
caulk, also known as sealant, is used to transition windows to adjacent
claddings; we call this a perimeter isolation joint. The windows and claddings resist water and air
infiltration with the help of the weather resistive barrier (WRB) at the
cladding substrate. The area between the
cladding and WRB is known as the drainage plain. In a recent blog post, I
defined and quantified the volume of water that the drainage plain should be capable
of managing. Water at the drainage plain is
commonly referred to as incidental water.
The incidental water should be controlled and directed to the exterior. The interfacing of the weather resistive
barrier at openings in the wall is critical but, because the weather barrier
interfacing occurs behind the surface of the cladding and abutting components,
it is often undervalued.
Friday, February 22, 2013
Door Blower Usage
By: Abdullah Khaliqi
The door
blower is one of many versatile tools utilized by R. J. Kenney Associates,
Inc. (RJK ). This blog post highlights one of the many ways it can be used.
Friday, February 15, 2013
What is Incidental Water Anyway?
By: Dominic L. Pusateri
Incidental water is a term used in the building codes and referenced in specifications but what constitutes incidental water?
Labels:
air vapor barrier,
ASTM,
AVB,
building envelope science,
bulk water,
coating,
flashing,
IBC,
Incidental water,
infiltration,
leak testing,
leaks,
membrane,
water,
weather resistive barrier,
WRB
Monday, February 11, 2013
RILEM Tube
By: Gil Castonquay
When faced with the challenge of identifying causes or sources of
water intrusion on a building enclosure, building scientists and design
professionals performing forensic building enclosure analysis have a multitude
of diagnostic tools and methods which to consider.